Calculated NEC 220.82 Summary
240V Split-Phase Dwelling| Line Item | Code Basis | Factor | Net VA |
|---|---|---|---|
| General Lighting & Receptacles (1,200 sq ft × 3 VA) | NEC 220.82(B)(1) | General Pool | 3,600 |
| Small Appliance (2 × 1,500 VA) + Laundry (1 × 1,500 VA) | NEC 220.82(B)(2) | General Pool | 4,500 |
| Fixed & Fastened Appliances (Range, Dryer, Water Heater, Kitchen, Pool) | NEC 220.82(B)(3) | General Pool | 22,500 |
| General Pool Demand (First 10 kVA @ 100% + Remainder @ 40%) | NEC 220.82(B) | 100% / 40% | 18,240 |
| Heat Pump (No Aux Resistance Strip) | NEC 220.82(C) | 100% Largest HVAC | 3,600 |
| Total Calculated Service Load | 91 A | 21,840 VA | |
Profile Specifications & Key Findings
Typical Dwelling: 1,200 sq ft condo unit with 125A feeder from building meter bank
Recommended Hardware Pathway: 125A feeder compliant directly via NEC 220.82 without HOA utility riser modification
Conductor Sizing Note: 125A dwelling feeder uses 2 AWG Cu or 1/0 AWG Al @ 75°C per NEC 310.12 (103.8 A 83% minimum).
- Upgrading a condo riser from 125A to 200A often costs tens of thousands in HOA vault work; accurate NEC math prevents unnecessary denials.
- Even with a 12 kW induction range and 4,500 VA electric water heater, calculated demand sits around 92 A on a 125A feeder.
- Leaves over 32 A of feeder headroom when no Level 2 EVSE is attached to the unit subpanel.
Navigating HOA and Building Feeder Limits on 125A Panels
Condominium owners face strict feeder limits from the building electrical room. When replacing gas or older electric appliances, property managers frequently ask for a stamped or documented NEC 220.82 worksheet before issuing alteration approval.
Under NEC 220.82, general loads including lighting (3,600 VA), small appliance/laundry circuits (4,500 VA), a 12,000 VA induction range, 2,400 VA compact dryer, 4,500 VA water heater, and kitchen loads total 30,600 VA. Applying 100% of the first 10,000 VA plus 40% of the remaining 20,600 VA yields 18,240 VA (76.0 A).
Adding Cooling / Heat Pump Without Crossing 125A
Adding a 3,600 VA central condenser or heat pump at 100% raises total demand to 21,840 VA (91.0 A), comfortably inside the 125A feeder limit with 34.0 A of remaining headroom.